WBHO was the Principal Contractor of the project to the DTMR, and engaged MVPH as the subcontractor with drainage structure expertise.
The project consisted of 5 drainage structures on Bruce Highway in Bajool, QLD.
They ranged from demolition of a 375mm RCP structure to the construction of a 5-cells 2.1m x 1.2m x 29m RCBC structure under the Bruce Highway.
All concrete and drainage work were carried out to TMR specification and inspected by TMR inspectors.