Restoration works to Gladstone Regional Council’s Road and drainage infrastructure damaged by flood events and funded under the Natural Disaster Relief and Recovery Arrangements (NDRRA) Program (2015) Included over 700m3 concrete, 2000 Ton armour rock and 32 semi-loads of box culverts over 27 sites
James Street Footpath, Rosedale Primary School
The existing grassed footpath and median at the front of Rosedale School is used for pedestrian access to the general